1. Home
  2. Projects
  3. Modular Buildings in Military Field
  4. Multi Story Modular Buildings, Project in Algeria
Multi Story Modular Buildings, Project in Algeria

Haicheng's stand-alone modular buildings are an ideal solution for large construction site camp solutions, like the one in Algeria.

To provide full, on site, permanent camping services, Haicheng was chosen to carry out the manufacturing, purchasing, logistics and construction with the support of the customer's design and foundation teams.

The Algerian project was a recent full turn-key solution project, started towards the end of 2015, and completed by May of 2016. These 3 story stand-alone houses can house over 200 people, and serve as facilities for accommodation, a restaurant, site office, gymnasium, and laundry facilities. All camp facilities, from daily living equipment to office supplies and entertainment facilities are all easily carried out using our 3 story modular houses.

Priorities for this camp included plumbing, electrical systems, HVAC and roofing,

1. Engineering for the entire scope of a project like this is carried out in separate divisions or teams, including plumbing, electricity, and structural engineering. As the names imply, each team is dedicated to their specific division; i.e plumbers on plumbing, electricians focus on wiring and other electrical requirements, and structural engineers focus on the building structure. However, during construction, each group maintains communication to ensure a smooth building process.

2. HVAC is an essential part of any building engineering project to ensure heating, ventilation, and AC inside the building is up to code for health and safety of the people using the building, especially in hot environments.

The standardized and flexible modular building system from Haicheng ensures all client requirements are met within a tight time schedule. Eventually, all modular buildings within the time constraints must receive order confirmation from the client, as was the case here in Algeria. Although the modular system was altered several times at the construction site, the project was not delayed due to the quick and easy construction of the modular building system.