1. Home
  2. Projects
  3. Prefab Building in Mining and Construction Site
  4. Prefabricated Modular Building, Project in Niger
Prefabricated Modular Building, Project in Niger

A customer in Niger came to us for a modular container system to serve as site offices and sanitary units. We were chosen to carry out the design, manufacturing, purchasing, logistics and construction with support from the client's foundation works to build 38 single level modular buildings.

This site was a nuclear power station, and needed space for single level flat packed buildings to be used as accommodation, catering, laundry, recreation and infrastructure in a covered area of 5,000 square meters. Exposed wiring was used to make the layout more flexible, and professional training was given to local employees and users. From the initial bid to final operation of the flat packed building site, strict international operation procedures were followed, benefiting everyone involved with knowledge, skill and experience.

This standard, but flexible modular system met all customer requirements under an extremely tight building schedule. Though adjustments were made throughout construction of the modular building project, all buildings were completed on time, fully confirmed by the client.